SWT has completed numerous tasks over the past 10 years under Master Service Agreements (A&E Multi Discipline) for the County of Santa Barbara and currently has a new multi-discipline contract pending for the period of September 2017 through June 2020.
SWT provided design services for the 54.8 Acre Unit 4 Phase 1 Groundwater Protection System, Construction Drawings, specifications and Design Report through SWT’s On-Call Engineering Services Contract with SWMD (2016 to 2019).
SWT has provided on-call engineering services with Team Member Geosyntec (2009 through 2012), (2013 through 2015), and (2015 through 2019). Project support to Orange County Waste and Recycling.
SWT prepared Construction Drawings, specifications and Design Report through the On-Call Engineering Services Contract with SWMD (2016 to 2019). SWT is also performing construction engineering support for this project.
SWT provided Engineering Design, and Construction Engineering Support Services for the Phase 1 Partial Final Closure Construction Project for 68.9 Acres of closure construction at the front face (First Phase) of the Olinda Alpha Landfill.